EPC Rules for Landlords: The Minimum Rating and 2030

Table of Contents

Share this post

A rental property in England must have an EPC rated E or better before it can be let or continue to be let, unless a valid exemption is registered. A higher standard applies to all tenancies from 1 October 2030. This page sets out what is required today, what changes, and what it is likely to cost. If you would rather the compliance calendar was run for you, see our landlord service.

What is an EPC?

An Energy Performance Certificate rates a property’s energy efficiency from A, the best, to G, the worst. It also estimates running costs and lists recommended improvements with their likely effect on the rating.

A certificate lasts ten years. It is required when a property is built, sold or let, and it is a legal requirement to have one before marketing begins. The register is public, so a prospective tenant can look up your property with find an Energy Performance Certificate before they book a viewing.

How do you get an EPC?

An accredited domestic energy assessor visits the property and produces the certificate. You can find one through get a new energy certificate, and prices vary, so get more than one quotation.

The assessor records the age and construction of the building, the heating system and its controls, insulation in the walls, loft and floors, the glazing, and the lighting. A visit usually takes about an hour. Nothing is tested destructively, so where evidence of insulation cannot be seen, the assessor has to assume the worst case for the property’s age.

That last point is worth money. If you have insulated a wall or a loft and you can produce the paperwork, photographs or an installer certificate, the assessor can use it. Without evidence, the software assumes the default, and the rating comes out lower than the building deserves.

What rating do you need today?

Band E. Under the minimum energy efficiency standard, a property rated F or G cannot be let or continue to be let unless an exemption is registered against it. The full position is in the GOV.UK landlord guidance on minimum energy efficiency.

The maximum civil penalty a local authority can impose today is GBP 5,000 per property in total across all breaches.

What changes on 1 October 2030?

The government confirmed the new standard in the government response of 21 January 2026. It applies to all tenancies from 1 October 2030, with no earlier date for new lettings.

  • It is a dual metric. Properties must meet a fabric performance standard on the new EPCs, plus one of two secondary metrics: smart readiness or heating system. Landlords choose which of the two to meet.
  • Landlords are required to invest up to GBP 10,000 per property. The government’s own estimate of average spend is GBP 5,400.
  • A property that reaches band C or higher on the current energy efficiency rating before 1 October 2029 is treated as compliant until that certificate expires or is replaced.
  • The maximum penalty rises to GBP 30,000 per property per breach, including for registering false exemption information.
  • A new EPC is needed before improvement work starts, and another after it finishes.

The grandfathering date matters more than it looks. Reaching band C on the current rating before 1 October 2029 buys a property the rest of its certificate’s life. If you own something close to C, that is an argument for doing the work in 2028 rather than 2030.

What if a property cannot reach the standard?

Exemptions exist, they have to be registered, and they are not permanent. The current set includes a high cost exemption, an all relevant improvements made exemption, a wall insulation exemption, a third-party consent exemption and a property devaluation exemption. Most last five years.

Under the 2030 standard the list expands, and the cost cap and affordability exemptions last ten years rather than five. There is also an adjustment for properties valued below GBP 100,000. Registering one is done through registering an exemption.

An exemption is a last resort, not a plan. It has to be evidenced, it expires, and a false registration is the one breach the new penalty regime names specifically.

What improvements actually move the rating?

  • Loft insulation, which is usually the cheapest gain per pound spent.
  • Cavity wall insulation where the construction allows it.
  • Heating controls, including a programmer, room thermostat and thermostatic radiator valves.
  • Replacing an old boiler or moving to a heat pump, which the new heating system metric will reward.
  • Low energy lighting throughout, which is cheap and counts.
  • Draught proofing, and hot water cylinder insulation where there is one.
  • Glazing, which is expensive per point and rarely the first thing to do.

Take the recommendations on your own certificate as the starting point, because they are modelled against that specific building. The wider case for the work is in eight ways to improve energy efficiency and maximising rental income.

Common questions

How long does an EPC last?

Ten years from the date it was lodged. You do not have to renew it at ten years unless you are selling, letting or re-letting, but you do need a valid one in place for a new tenancy.

Do listed buildings need an EPC?

Not always. Protected buildings can fall outside the requirement where meeting the minimum energy performance requirements would unacceptably alter their character or appearance. This is a judgement rather than a blanket exemption, so take advice on the specific building rather than assuming a listing settles it.

Can a tenant insist on improvements?

A tenant cannot require work simply because the rating is low. What they can do is report a property that is being let below band E without a registered exemption, and local authorities enforce it.

What if the EPC rating is wrong?

Assessors work from what they can see and from defaults where they cannot. If you believe the assessment missed insulation or a system upgrade, gather the evidence and commission a fresh assessment. It is often cheaper than the improvement work the old certificate implies you need.

Does this affect selling as well as letting?

A valid certificate is required to market any property for sale, and the rating is shown on every portal listing. There is no minimum band for a sale, but a poor rating is now a negotiating point for buyers who can see what the work will cost them. See selling your home.

Letting in East Anglia

Morris Armitage tracks certificates and renewal dates as part of managing a let, alongside the wider duties set out in landlord legal requirements and the GOV.UK guide to the Renters’ Rights Act. The branches are at Newmarket, Cambridge, Burwell and Downham Market, and we are a member of The Property Ombudsman.

If you are buying to let rather than letting what you own, buy-to-let in East Anglia covers the numbers, and current stock is on browse properties.

Not sure where your portfolio sits against 2030? Contact Morris Armitage or request a rental valuation.